Financial System
Modular Data Center Solutions
Empowering smart finance and improving the level of inclusive financial services and operational efficiency
Financial System
Modular Data Center Solutions
Empowering smart finance and improving the level of inclusive financial services and operational efficiency
行业挑战
Industry Challenges
Low Space Utilization
Most bank branches operate in rented premises with high rental cost per unit area. Some banks separate monitoring and communication equipment into two rooms, resulting in low space utilization and duplicated investment in certain equipment.
Low Integration
Low integration between equipment and cabinets in bank branch computer rooms. Tower UPS and backup batteries are placed separately, with multiple wall-mounted distribution boxes.
Lack of Professional Maintenance Staff
The daily computer room administrators at bank branches are part-time staff from branch offices, bearing heavy O&M workload. Inspections mainly rely on visual check. Fault troubleshooting is difficult, and environmental conditions are hard to monitor and manage.
Limited Monitoring & Control
The power and environment monitoring system of bank branch computer rooms is incomplete. Most only support temperature and humidity monitoring, and some have UPS monitoring. There is no unified data collection, analysis and management, making centralized control difficult.
Slow Delivery & Cumbersome After-sales Service
In the traditional model, multiple vendors and devices lead to long on-site construction cycles, heavy workload and low efficiency. Buck-passing often occurs, and customers need to contact multiple parties for after-sales support, resulting in high pressure.
No Professional Cooling Equipment
Most computer rooms at bank branches use ordinary civilian air conditioners, which fail to deliver full cooling performance and provide inaccurate temperature and humidity control.
Industry Challenges
行业挑战
Low Space Utilization
Most bank branches operate in rented premises with high rental cost per unit area. Some banks separate monitoring and communication equipment into two rooms, resulting in low space utilization and duplicated investment in certain equipment.
Low Integration
Low integration between equipment and cabinets in bank branch computer rooms. Tower UPS and backup batteries are placed separately, with multiple wall-mounted distribution boxes.
Lack of Professional Maintenance Staff
The daily computer room administrators at bank branches are part-time staff from branch offices, bearing heavy O&M workload. Inspections mainly rely on visual check. Fault troubleshooting is difficult, and environmental conditions are hard to monitor and manage.
Limited Monitoring & Control
The power and environment monitoring system of bank branch computer rooms is incomplete. Most only support temperature and humidity monitoring, and some have UPS monitoring. There is no unified data collection, analysis and management, making centralized control difficult.
Slow Delivery & Cumbersome After-sales Service
In the traditional model, multiple vendors and devices lead to long on-site construction cycles, heavy workload and low efficiency. Buck-passing often occurs, and customers need to contact multiple parties for after-sales support, resulting in high pressure.
Industry Case
Project case presentation of Bank of Ningbo Shanghai Branch
Project Background
Bank of Ningbo is a regional listed Sino-foreign joint venture bank and one of China’s 20 systemically important commercial banks. It boasts distinctive regional features and strong competitiveness, characterized by efficient services, innovative financial products and sound operation. DTCT serves as an approved supplier and O&M contractor for its head office.
Project Overview
The project adopts DTCT modular data center solution, consisting of a closed cold aisle with 24 cabinets, 2 sets of 40KW air conditioners, 1 power distribution cabinet and one set of power & environment monitoring system. Security video surveillance, access control system and various collectors in the computer room are centrally monitored and managed by the DTCT power & environment monitoring host.
Case presentation of Bank of China Ninghai Branch project
Project Background
Bank of China (BOC) is one of China’s four major state-owned commercial banks and one of the earliest commercial banks in China. It has a huge capital base and sufficient capital funds. As the only Chinese commercial bank classified as a Global Systemically Important Bank, BOC is committed to delivering comprehensive, high-quality financial services for customers worldwide.
Project Overview
The system consists of 6 modular cabinets sized 600*1200*2000mm (W*D*H), with overall installation dimensions of 3600*1280*2000mm (W*D*H). Each cabinet contains 1 set of intelligent power distribution unit, 2 units of 4kW rack-mounted variable frequency air conditioners plus supporting accessories, and 1 power & environment management module with a 7-inch smart touchscreen display. Among them, 1 main cabinet accommodates data center infrastructure; 2 security cabinets house NVRs, video monitoring switching power supplies, power & environment monitoring hosts and rack-mounted fire protection equipment; 1 cabling cabinet holds patch panels and switches; 1 cabinet is for batteries. The total usable space for IT equipment is ≥216U.
Case Presentation Of Agricultural Bank Of China Jiangbei Branch Project
Project Background
Agricultural Bank of China (ABC) is one of China’s major comprehensive financial service providers, renowned for its robust rural financial service network, extensive business coverage and steady operation. Committed to serving agriculture, rural areas and farmers, the bank delivers full-range financial services for rural regions and also holds a key position in the urban financial market, demonstrating comprehensive and professional financial service capabilities.
Project Overview
This project adopts 3 modular cabinets with dimensions of 600*1000*2000mm (W*D*H), with the overall installation size of 2000*1080*2000mm (W*D*H). Each cabinet is equipped with 1 set of intelligent power distribution unit, 1 unit of 4kW rack-mounted variable frequency air conditioner with supporting accessories, 1 set of power and environment management module with a 7-inch smart touch screen and background lighting system. Among them, 1 security cabinet accommodates NVR, video monitoring switching power supply and environment monitoring host; 1 cabling cabinet holds modular integrated equipment, patch panels and switches; 1 cabinet is dedicated for battery placement. The total available space for IT equipment is ≥93U.
Industry Case
中国银行宁海支行项目案例展示
项目背景
中国银行,简称BOC,是中国四大国有商业银行之一,是中国最早的商业银行之一,资本规模庞大,资本金充足,是中国唯一一家跻身全球系统重要性银行的商业银行,致力于为全球客户提供全方位、高品质的金融服务。
项目概况
6台尺寸为600*1200*2000mm(宽*深*高)模块化机柜组成,整体安装尺寸:3600*1280*2000mm(宽’深*高)。柜内含1套智能配电单元、2台4KW机架式变频空调及配套空调辅材、1套动环管理模块(7英寸智能触摸屏显示),其中1台主柜用于放置数据中心基础设施,2台安防系统柜用于放置硬盘录像机视频监控开关电源、动环主机及机架式消防,1台科技布线柜用于放置配线架和交换机,1台机柜用于放置电池,整体IT设备可用空间≥216U。
Project case presentation of Bank of Ningbo Shanghai Branch
Project Background
Bank of Ningbo is a regional listed Sino-foreign joint venture bank and one of China’s 20 systemically important commercial banks. It boasts distinctive regional features and strong competitiveness, characterized by efficient services, innovative financial products and sound operation. DTCT serves as an approved supplier and O&M contractor for its head office.
Project Overview
The project adopts DTCT modular data center solution, consisting of a closed cold aisle with 24 cabinets, 2 sets of 40KW air conditioners, 1 power distribution cabinet and one set of power & environment monitoring system. Security video surveillance, access control system and various collectors in the computer room are centrally monitored and managed by the DTCT power & environment monitoring host.
Case presentation of Bank of China Ninghai Branch project
Project Background
Bank of China (BOC) is one of China’s four major state-owned commercial banks and one of the earliest commercial banks in China. It has a huge capital base and sufficient capital funds. As the only Chinese commercial bank classified as a Global Systemically Important Bank, BOC is committed to delivering comprehensive, high-quality financial services for customers worldwide.
Project Overview
The system consists of 6 modular cabinets sized 600*1200*2000mm (W*D*H), with overall installation dimensions of 3600*1280*2000mm (W*D*H). Each cabinet contains 1 set of intelligent power distribution unit, 2 units of 4kW rack-mounted variable frequency air conditioners plus supporting accessories, and 1 power & environment management module with a 7-inch smart touchscreen display. Among them, 1 main cabinet accommodates data center infrastructure; 2 security cabinets house NVRs, video monitoring switching power supplies, power & environment monitoring hosts and rack-mounted fire protection equipment; 1 cabling cabinet holds patch panels and switches; 1 cabinet is for batteries. The total usable space for IT equipment is ≥216U.
Case Presentation Of Agricultural Bank Of China Jiangbei Branch Project
Project Background
Agricultural Bank of China (ABC) is one of China’s major comprehensive financial service providers, renowned for its robust rural financial service network, extensive business coverage and steady operation. Committed to serving agriculture, rural areas and farmers, the bank delivers full-range financial services for rural regions and also holds a key position in the urban financial market, demonstrating comprehensive and professional financial service capabilities.
Project Overview
This project adopts 3 modular cabinets with dimensions of 600*1000*2000mm (W*D*H), with the overall installation size of 2000*1080*2000mm (W*D*H). Each cabinet is equipped with 1 set of intelligent power distribution unit, 1 unit of 4kW rack-mounted variable frequency air conditioner with supporting accessories, 1 set of power and environment management module with a 7-inch smart touch screen and background lighting system. Among them, 1 security cabinet accommodates NVR, video monitoring switching power supply and environment monitoring host; 1 cabling cabinet holds modular integrated equipment, patch panels and switches; 1 cabinet is dedicated for battery placement. The total available space for IT equipment is ≥93U.
Solution Value
Integrated Layout Design
Adopting integrated design to save space, improve computer room space utilization and reduce rental costs
Remote Centralized Management & Control
Supports remote centralized management and vertical deployment from branch to sub-bank, enabling real-time proactive risk prevention
Stable and Reliable Cooling
Rack-mounted professional air conditioners deliver precise cooling with high energy efficiency
Comprehensive & Precise System Control
In addition to basic temperature and humidity monitoring, it fully monitors water leakage, air conditioners and power distribution. Status can be accessed locally, remotely via APP, SMS and email.
Fast Delivery & One-stop After-sales Service
Available for immediate supply and fast delivery. One single contact for all after-sales requirements.
Precise Management with Traceable Records
Cabinet-level fingerprint access control. It records detailed information including operation time, duration, operator name and department when cabinet doors are opened. Hierarchical and departmental access management ensures that devices in cabinets managed by different departments remain unaffected during door-opening operations.
Solution Value
Integrated Layout Design
Adopting integrated design to save space, improve computer room space utilization and reduce rental costs
Remote Centralized Management & Control
Supports remote centralized management and vertical deployment from branch to sub-bank, enabling real-time proactive risk prevention
Stable and Reliable Cooling
Rack-mounted professional air conditioners deliver precise cooling with high energy efficiency
Comprehensive & Precise System Control
In addition to basic temperature and humidity monitoring, it fully monitors water leakage, air conditioners and power distribution. Status can be accessed locally, remotely via APP, SMS and email.
Fast Delivery & One-stop After-sales Service
Available for immediate supply and fast delivery. One single contact for all after-sales requirements.
Precise Management with Traceable Records
Cabinet-level fingerprint access control. It records detailed information including operation time, duration, operator name and department when cabinet doors are opened. Hierarchical and departmental access management ensures that devices in cabinets managed by different departments remain unaffected during door-opening operations.
Cooperative Bank
Cooperative Bank