Industry Challenges
Low Space Utilization
Hospital machine rooms mostly use traditional construction with open cooling, resulting in low space utilization, poor cooling efficiency, and high energy consumption.
Poor Scalability and Compatibility
Medical institutions run many IT systems, such as HIS, LIS, PACS, electronic medical records, and OA systems, creating heavy demand for infrastructure retrofits and expansion. Different suppliers make later maintenance and repair difficult, and upgrades must also keep the power supply uninterrupted.
Incomplete Power & Environment Monitoring
The power and environment control systems are built by third-party software vendors and don't match the products well, often suffering freezes, crashes, stale monitoring data, and frequent false alarms, which affects staff judgment and response timeliness.
Industry Challenges
Low Space Utilization
Hospital computer rooms are generally built in the traditional mode with open cooling, featuring low space utilization, poor cooling effect and high energy consumption.
Poor Expandability and Compatibility of Computer Room
The medical industry has various information systems including HIS, LIS, PACS, EMR and OA systems, which generate frequent demands for infrastructure renovation and capacity expansion. Different suppliers bring difficulties in later maintenance and repair. Besides, uninterrupted power supply must be guaranteed during computer room renovation and expansion.
Incomplete Power and Environment Monitoring System
Power and environment monitoring systems are developed by third-party software companies and incompatible with hardware products. They often suffer from crashes, downtime, delayed monitoring data and frequent false alarms, which impair staff judgment and response timeliness.
Lack of Professional Computer Room Maintenance Skills and Experience
Computer room administrators in secondary and lower-level hospitals are mainly network professionals. They usually conduct daily inspections of computer room infrastructures through visual observation, making it difficult to handle equipment faults and effectively monitor and manage the computer room operating environment.
Air Conditioning & Cooling Equipment Fails to Meet Professional Requirements
Under the traditional computer room construction mode, air conditioning delivers unsatisfactory cooling performance with inaccurate temperature and humidity control. Local hotspots tend to occur on equipment, impairing equipment performance and service life.
Slow Delivery, Troublesome After-sales Service
The installation and construction cycle is excessively long, mostly ranging from 3 to 6 months. After-sales service requires coordination with multiple suppliers, leading to delayed responses and widespread buck-passing.
Industry Cases
Case presentation of Ningbo First Hospital project
Project Background
The Fangqiao Campus of Ningbo No.1 Hospital is a key provincial and municipal project launched in 2019. It represents the largest investment in the healthcare sector of Ningbo to date, covering a total land area of approximately 409 mu. The new campus was officially put into operation on June 20, 2022.
Project Overview
The data room procurement project for the off-site construction (Phase I) of Ningbo No.1 Hospital is located on the 4th floor of the building, with an area of about 256 square meters. It is divided into four functional zones: data center room, access computer room, power distribution room and operation room, covering 145m², 32m², 48m² and 31m² respectively.
The access computer room consists of one set of 7-rack micro-module system, one gas fire protection cabinet (120 single-bottle cabinet-type HFC-227ea fire extinguishing device) and one 12KW base station air conditioner. The 7-rack micro-module system includes 7 server cabinets, among which 2 sets are equipped with 4kW green variable-frequency cooling modules (max cooling capacity 8kW), and 1 set of intelligent power distribution module.
Case presentation of Chengdu Blood Center project
Project Background
Chengdu Blood Center was founded in 1962 and is affiliated to Chengdu Municipal Health Commission. It is a public welfare health institution integrating blood collection, testing, preparation, storage, supply, scientific research and teaching. It undertakes the important task of supplying clinical blood and ensuring blood safety for more than 350 medical institutions across 23 districts, cities and counties in the city.
Project Overview
This project involves the procurement of modular data center and network equipment for Chengdu Blood Center to support blood collection & supply, administrative office, logistics management and other services.
Designed as a Class B computer room, it is required to support unattended operation.
The main computer room covers a planned area of about 303㎡, divided into power distribution zone, main equipment room and management & control zone. A double-row enclosed cold aisle composed of 22 modular cabinets is deployed. There is also one backup computer room with a planned area of around 40㎡. Core products include IDC cabinets, green intelligent all-in-one micro data room units, etc. The solution improves the management and service capacity of Chengdu Blood Center and reduces resource waste in data transmission and control.
Case presentation of Huzhou Third People's Hospital project
Project Background
Huzhou No.3 People's Hospital was founded in November 1951. It is one of Zhejiang’s first batch of Grade A tertiary psychiatric specialized hospitals, a modern hospital integrating medical treatment, prevention, rehabilitation, scientific research and education.
Project Overview
A set of double-row enclosed cold aisle consists of 13 modular cabinets and 1 precision UPS integrated power distribution cabinet. The cabinet dimension is 800*1200*2000mm for expanded cable routing space.
Industry Cases
Case presentation of Chengdu Blood Center project
Project Background
Founded in 1962 under the Chengdu Municipal Health Commission, the Chengdu Blood Center integrates blood collection, testing, preparation, storage, supply, research and teaching. It supplies clinical blood to 23 districts and over 350 medical institutions across the city, and also serves as Sichuan's blood management and transfusion quality control center.
Project Overview
This project supplies the Chengdu Blood Center with a modular data center and network equipment to support blood supply, administration, and logistics.
Built to Class B standards for unattended operation.
The main room covers about 303 m² (power distribution, main room, and control areas) with 22 modular cabinets forming a double-row enclosed cold aisle, plus a backup room of about 40 m². Core products include IDC cabinets and green all-in-one micro data centers, improving management and cutting resource waste in data transmission.
Case presentation of Huzhou Third People's Hospital project
Project Background
Founded in November 1951, Huzhou Third People's Hospital is one of Zhejiang's first Grade-A Class 3 psychiatric specialty hospitals, a modern institution integrating medical care, prevention, rehabilitation, research, and education.
Project Overview
13 modular cabinets plus one precision UPS integrated power distribution cabinet form a double-row enclosed cold aisle; the cabinets measure 800*1200*2000mm for more cable-management space.
Case presentation of Ningbo First Hospital project
Project Background
Ningbo First Hospital's Fangqiao campus is a 2019 provincial and municipal key project — the largest health-sector investment in Ningbo to date, covering about 409 mu. The new campus opened on June 20, 2022.
Project Overview
Located on the fourth floor, the data center for Ningbo First Hospital's Phase I relocation project covers about 256 m², split into four areas: the main machine room (145 m²), access machine room (32 m²), power room (48 m²), and operation room (31 m²).
The central room comprises one micro-module system, one 16-cabinet unit, 3 gas fire-suppression cabinets (150 single-bottle HFC-227ea), and one room-level precision AC (25kW). The micro-module holds 35 server cabinets, 6 row-side precision ACs (40kW), and one precision power distribution cabinet. The 16-cabinet unit holds 11 server cabinets, 4 network cabling cabinets, and one precision power distribution cabinet, 3 of which feature green 15kW variable-frequency cooling modules (up to 45kW).
The access room comprises one 7-cabinet micro-module system, one gas fire-suppression cabinet (120 single-bottle HFC-227ea), and one 12KW base station AC. The 7-cabinet system holds 7 server cabinets, 2 fitted with green 4kW variable-frequency cooling modules (up to 8kW), plus one smart power distribution module.
Solution Value
Rapid Deployment
The medical industry is highly dependent on computer rooms and has low tolerance for power outages. It is generally recommended to complete renovation and equipment migration with no power cut or within an extremely short period, which imposes high requirements on the implementation efficiency of infrastructure.
High Stability
The medical industry generally follows Class A computer room construction standards, adopting dual ATS incoming power supply and two independent UPS systems. The required battery backup time is more than 4 hours (a very small number of hospitals require more than 2 hours).
Intelligent Management
It supports remote centralized management and control with vertical architecture deployment of General Hospital — Branch Hospital — Aggregation Computer Room — Weak Current Room.
Strong Expandability
The medical industry attaches great importance to informatization. Equipment addition and replacement happen relatively rapidly every year, which sets high requirements for the expandability of cabinets, power supply and cooling of infrastructure. Power-free and error-free capacity expansion is required.
High Service Requirements
Short response time and fast troubleshooting for after-sales and O&M services,
without disrupting normal hospital operations.
Solution Value
Rapid Deployment
Medical institutions depend heavily on machine rooms and tolerate outages poorly; retrofits and equipment migration should ideally be done with no or minimal downtime, demanding high implementation efficiency.
High Stability
Medical machine rooms generally follow Grade-A requirements: dual ATS feeds, two independent UPS systems, and battery backup of over 4 hours (a few hospitals require over 2 hours).
Intelligent Management
Supports remote centralized control with a vertical architecture of main hospital — branch hospital — aggregation room — weak-current room.
Strong Scalability
Medical IT is highly valued, with equipment added or replaced quickly each year, so infrastructure cabinets, power and cooling must scale with no downtime and zero-error expansion.
High Service Requirements
After-sales and O&M response must be fast with quick handling,
without disrupting hospital operations.